Resumen
This paper shows the results of integrating two meta-heuristic techniques, GRASP and Path-Relinking, which have not been widely used to solve production-scheduling problems despite of their proved efficiency. These techniques were used to solve the problem of minimizing total weighted tardiness problem in a machine, 1 Σ WjTj, and good results in short time were obtained. Experiment outcomes show that the use of Path-Relinking as a final step for GRASP can result in qualitysequence improvements. In order to use GRASP in the solution to this problem, a dynamic utility function for the jobs to process, bearing in mind its descriptive parameters, is proposed. Additionally, this work offers a clear implementation proposal for ventures of different sizes, so they are able to overcome this problem by using MS Excel, instead of specialized scheduling software.
Título traducido de la contribución | Combined use of GRASP and path-relinking during production scheduling in order to minimize total weighted tardiness in a machine |
---|---|
Idioma original | Español |
Páginas (desde-hasta) | 79-96 |
Número de páginas | 18 |
Publicación | Ingenieria y Universidad |
Volumen | 14 |
N.º | 1 |
Estado | Publicada - 2010 |
Palabras clave
- GRASP (computer file)
- Production scheduling
- Times and movements