TY - JOUR
T1 - Delay causes in road infrastructure projects in developing countries
AU - Mejía, Guillermo
AU - Sánchez, Omar
AU - Castañeda, Karen
AU - Pellicer, Eugenio
N1 - Publisher Copyright:
© 2020, Pontificia Universidad Catolica de Chile, Escuela de Construccion Civil.
PY - 2020
Y1 - 2020
N2 - Project delays adversely affect road infrastructure development in developing countries. Unfavorable consequences of project delays involve cost overrun, contractual disputes, arbitration, and quality non-conformities. Despite these risks, literature shows that delays are still a prevalent problem in construction management. Although there is a considerable number of publications on project delays, few studies have compared their causes between developing countries. Therefore, this study aimed to: a) classify and determine the level of influence of the delay causes; b) find the relationship between delay causes and country's development; and c) propose recommendations for mitigating the most critical causes in developing countries. A systematic literature review provided a sample of 14 primary studies from Africa (50%) and Asia (50%). Based on this sample, the study found that developing countries, with a GDP per capita ($US2018) ≤ $ 2,000, may experience different delay causes depending on the economic and the geographical contexts. In African countries with a Global Competitiveness Index -GCI ≤ 56, road projects may experience delays due to financial issues of the project owner, as well as delays due to equipment/material issues of the project supplier/subcontractor. On the other hand, in Asian countries with a GCI between 62 and 49, road projects may experience delays due to financial issues of the project contractor, and delays due to planning issues of the project designer/consultant. According to these economic contexts, this study proposes a frame of causes and mitigation actions as a contribution to the risk analysis of road projects in developing countries.
AB - Project delays adversely affect road infrastructure development in developing countries. Unfavorable consequences of project delays involve cost overrun, contractual disputes, arbitration, and quality non-conformities. Despite these risks, literature shows that delays are still a prevalent problem in construction management. Although there is a considerable number of publications on project delays, few studies have compared their causes between developing countries. Therefore, this study aimed to: a) classify and determine the level of influence of the delay causes; b) find the relationship between delay causes and country's development; and c) propose recommendations for mitigating the most critical causes in developing countries. A systematic literature review provided a sample of 14 primary studies from Africa (50%) and Asia (50%). Based on this sample, the study found that developing countries, with a GDP per capita ($US2018) ≤ $ 2,000, may experience different delay causes depending on the economic and the geographical contexts. In African countries with a Global Competitiveness Index -GCI ≤ 56, road projects may experience delays due to financial issues of the project owner, as well as delays due to equipment/material issues of the project supplier/subcontractor. On the other hand, in Asian countries with a GCI between 62 and 49, road projects may experience delays due to financial issues of the project contractor, and delays due to planning issues of the project designer/consultant. According to these economic contexts, this study proposes a frame of causes and mitigation actions as a contribution to the risk analysis of road projects in developing countries.
KW - Delay causes
KW - Delay factors
KW - Road infrastructure
KW - Road projects
KW - Systematic review
UR - http://www.scopus.com/inward/record.url?scp=85091483457&partnerID=8YFLogxK
U2 - 10.7764/rdlc.19.2.220-234
DO - 10.7764/rdlc.19.2.220-234
M3 - Article
AN - SCOPUS:85091483457
SN - 0717-7925
VL - 19
SP - 220
EP - 234
JO - Revista de la Construccion
JF - Revista de la Construccion
IS - 2
ER -