Cost Deviation Causes in Colombian Construction Projects: A Frequency and Severity Analysis

Omar Sanchez, Karen Castaneda, Rodrigo F. Herrera, Eugenio Pellicer, Laura Almanza, Ricardo Cadavid

Producción: Capítulo del libro/informe/acta de congresoContribución a la conferenciarevisión exhaustiva

5 Citas (Scopus)

Resumen

Construction projects, both in developed and developing countries, are widely affected by cost deviations that arise at the completion of the construction process; these deviations manifest themselves as a difference between the executed cost and the planned cost. To mitigate cost deviation, the first step is to identify the causes that originate the phenomenon. Therefore, several studies have been focused on the identification and characterization of the causes that originate the deviations in various countries. However, there is a lack of studies focused on the frequency and severity analysis of the cost deviation causes in the Colombian construction projects. Considering the knowledge gap, this paper presents a frequency and severity analysis of the cost deviation causes in Colombian construction projects by consulting a group of professionals. The research method has four main stages: 1) cost deviation causes identification; 2) questionnaire design, validation, and calibration; 3) questionnaire survey; and 4) frequency and severity analysis. Thirty-eight cost deviation causes were identified, and forty-six professionals from the Colombian construction industry were consulted. The findings show that the three most common causes of cost deviation are: 1) delays of activities, 2) slow permits by local authorities, and 3) unrealistic contract duration. The three most severe cost deviation causes are: 1) slow permits by local authorities, 2) delays of activities, and 3) financial difficulties of the owner.

Idioma originalInglés
Título de la publicación alojada2021 7th Congreso Internacional de Innovacion y Tendencias en Ingenieria, CONIITI 2021 - Conference Proceedings
EditoresVictor Manuel Fontalvo Morales
EditorialInstitute of Electrical and Electronics Engineers Inc.
ISBN (versión digital)9781665402217
DOI
EstadoPublicada - 2021
Publicado de forma externa
Evento7th Congreso Internacional de Innovacion y Tendencias en Ingenieria, CONIITI 2021 - Bogota, Colombia
Duración: 29 sep. 202101 oct. 2021

Serie de la publicación

Nombre2021 7th Congreso Internacional de Innovacion y Tendencias en Ingenieria, CONIITI 2021 - Conference Proceedings

Conferencia

Conferencia7th Congreso Internacional de Innovacion y Tendencias en Ingenieria, CONIITI 2021
País/TerritorioColombia
CiudadBogota
Período29/09/2101/10/21

Huella

Profundice en los temas de investigación de 'Cost Deviation Causes in Colombian Construction Projects: A Frequency and Severity Analysis'. En conjunto forman una huella única.

Citar esto