Ir directamente a la navegación principal Ir directamente a la búsqueda Ir directamente al contenido principal

Building Information Modeling 5D and Earned Value Management methodologies integration through a computational tool

Título traducido de la contribución: Integración de las metodologías Building Information Modeling 5D y Earned Value Management a través de una herramienta computacional
  • Pontificia Universidad Javeriana

Producción: Contribución a una revistaArtículorevisión exhaustiva

8 Citas (Scopus)

Resumen

Many construction projects present uncertainty in their budgets and schedules. Also, the management of time and costs is inconsistent. There are methodologies and techniques that improve the management of construction projects: Techniques such as Earned Value Management (EVM), ideal for planning, monitoring and controlling the management of time and costs during the execution of projects, and methodologies such as Building Information Modeling (BIM) recognized for improving the planning and design of construction projects. This paper proposes the integration of BIM and EVM through an OpenBIM software called COST-BIM, designed in Java programming language and NetBeans 8.0.1 development environment. It manages construction projects time and costs under a single interface, consisting of four modules and fifteen processes. The software is validated through a real project of social interest housing (Vivienda de Interés Social VIS), comparing the budget, schedule, EVM original indicators and EVM projections of the project versus those generated by the tool. COST-BIM manages construction projects from its planning, during its execution and until its monitoring and control turning it into a useful software for construction managers that strive to increase the performance of their projects.

Título traducido de la contribuciónIntegración de las metodologías Building Information Modeling 5D y Earned Value Management a través de una herramienta computacional
Idioma originalInglés
Páginas (desde-hasta)263-278
Número de páginas16
PublicaciónRevista Ingenieria de Construccion
Volumen33
N.º3
DOI
EstadoPublicada - 2018

Huella

Profundice en los temas de investigación de 'Integración de las metodologías Building Information Modeling 5D y Earned Value Management a través de una herramienta computacional'. En conjunto forman una huella única.

Citar esto