Branch-and-price approach for the multi-skill project scheduling problem

Carlos Montoya, Odile Bellenguez-Morineau, Eric Pinson, David Rivreau

Producción: Contribución a una revistaArtículorevisión exhaustiva

52 Citas (Scopus)

Resumen

This work introduces a procedure to solve the multi-skill project scheduling problem (MSPSP) (Néron and Baptista, International symposium on combinatorial, optimization (CO’2002), 2002). The MSPSP mixes both the classical resource constrained project scheduling problem and the multi-purpose machine model. The aim is to find a schedule that minimizes the completion time (makespan) of a project, composed of a set of activities. In addition, precedence relations and resources constraints are considered. In this problem, resources are staff members that master several skills. Thus, a given number of workers must be assigned to perform each skill required by an activity. Practical applications include the construction of buildings, as well as production and software development planning. We present a column generation approach embedded within a branch-and-price (B&P) procedure that considers a given activity and time-based decomposition approach. Obtained results show that the proposed B&P procedure is able to reach optimal solutions for several small and medium sized instances in an acceptable computational time. Furthermore, some previously open instances were optimally solved.

Idioma originalInglés
Páginas (desde-hasta)1721–1734
Número de páginas14
PublicaciónOptimization Letters
Volumen8
DOI
EstadoPublicada - jun. 2014
Publicado de forma externa

Huella

Profundice en los temas de investigación de 'Branch-and-price approach for the multi-skill project scheduling problem'. En conjunto forman una huella única.

Citar esto