BIM-lean integration for construction scheduling of road intersections

  • Karen Castañeda
  • , Omar Sánchez
  • , Carlos A. Peña
  • , Rodrigo F. Herrera
  • , Guillermo Mejía
  • Universidad Industrial de Santander
  • Pontificia Universidad Católica de Valparaíso
  • Polytechnic University of Valencia
  • Universidad Francisco de Paula Santander

Producción: Contribución a una revistaArtículorevisión exhaustiva

5 Citas (Scopus)

Resumen

Road intersections are critical components of urban infrastructure networks, ensuring safe and efficient traffic flow. However, their construction frequently experiences delays and cost overruns, often due to inadequate schedule planning. To mitigate these issues, the integration of Building Information Modeling (BIM) and Lean Construction has emerged as a promising strategy. Despite the recognized benefits, their combined application in road infrastructure projects remains limited. This paper proposes a planning framework for planning road intersection construction schedules based on integrating BIM and Lean Construction. The framework was developed using Design Science Research (DSR), through iterative design, development, and evaluation stages. Validation was conducted using a case study involving an at-grade and a grade-separated intersection. Results demonstrate that incorporating BIM and Lean facilitates improved scheduling by integrating digital simulations of construction and traffic management. The proposed framework helps planners make more accurate, efficient, and data-driven scheduling decisions in digital simulations of complex infrastructure.

Idioma originalInglés
Número de artículo106247
Páginas (desde-hasta)1-35
Número de páginas35
PublicaciónAutomation in Construction
Volumen176
Fecha en línea anticipada14 may 2025
DOI
EstadoPublicada - ago 2025

ODS de las Naciones Unidas

Este resultado contribuye a los siguientes Objetivos de Desarrollo Sostenible

  1. ODS 9: Industria, innovación e infraestructura
    ODS 9: Industria, innovación e infraestructura

Huella

Profundice en los temas de investigación de 'BIM-lean integration for construction scheduling of road intersections'. En conjunto forman una huella única.

Citar esto