N2 - Hybrid manufacturing control architectures merge the benefits of hierarchical and heterarchical approaches. Disturbances can be handled at upper or lower decision levels, depending on the type of disturbance, its impact and the time the control system has to react. This paper focuses particularly on a disturbance handling mechanism at upper decision levels using a rescheduling manufacturing method. Such rescheduling is more complex that the offline scheduling since the control system must take into account the current system status, obtain a satisfactory performance under the new conditions, and also come up with a new schedule in a restricted amount of time. Then, this paper proposes a simple and generic rescheduling method which, based on the satisfying principle, analyses the trade-off between the rescheduling time and the performance achieved after a perturbation. The proposed approach is validated on a simulation model of a realistic assembly cell and results demonstrate that adaptation of the rescheduling time might be beneficial in terms of overall performance and reactivity.
AB - Hybrid manufacturing control architectures merge the benefits of hierarchical and heterarchical approaches. Disturbances can be handled at upper or lower decision levels, depending on the type of disturbance, its impact and the time the control system has to react. This paper focuses particularly on a disturbance handling mechanism at upper decision levels using a rescheduling manufacturing method. Such rescheduling is more complex that the offline scheduling since the control system must take into account the current system status, obtain a satisfactory performance under the new conditions, and also come up with a new schedule in a restricted amount of time. Then, this paper proposes a simple and generic rescheduling method which, based on the satisfying principle, analyses the trade-off between the rescheduling time and the performance achieved after a perturbation. The proposed approach is validated on a simulation model of a realistic assembly cell and results demonstrate that adaptation of the rescheduling time might be beneficial in terms of overall performance and reactivity.
KW - Manufacturing control
KW - Reactivity
KW - Rescheduling time
UR - http://www.scopus.com/inward/record.url?scp=85014933905&partnerID=8YFLogxK
U2 - 10.1007/978-3-319-51100-9_20
DO - 10.1007/978-3-319-51100-9_20
M3 - Chapter
AN - SCOPUS:85014933905
T3 - Studies in Computational Intelligence
SP - 225
EP - 236
BT - Studies in Computational Intelligence
PB - Springer Verlag
ER -