A new model and metaheuristic approach for the energy-based resource-constrained scheduling problem

Daniel Morillo Torres, Federico Barber, Miguel A. Salido

Producción: Contribución a una revistaArtículorevisión exhaustiva

9 Citas (Scopus)

Resumen

This article focuses on obtaining sustainable and energy-efficient solutions for limited resource programming problems. To this end, a model for integrating makespan and energy consumption objectives in multi-mode resource-constrained project scheduling problems (MRCPSP-ENERGY) is proposed. In addition, a metaheuristic approach for the efficient resolution of these problems is developed. In order to assess the appropriateness of theses proposals, the well-known Project Scheduling Problem Library is extended (called PSPLIB-ENERGY) to include energy consumption to each Resource-Constrained Project Scheduling Problem instance through a realistic mathematical model. This extension provides an alternative to the current trend of numerous research works about optimization and the manufacturing field, which require the inclusion of components to reduce the environmental impact on the decision-making process. PSPLIB-ENERGY is available at http://gps.webs.upv.es/psplib-energy/.

Idioma originalInglés
Páginas (desde-hasta)293-305
Número de páginas13
PublicaciónProceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture
Volumen233
N.º1
DOI
EstadoPublicada - 01 ene. 2019
Publicado de forma externa

Huella

Profundice en los temas de investigación de 'A new model and metaheuristic approach for the energy-based resource-constrained scheduling problem'. En conjunto forman una huella única.

Citar esto