Abstract
This paper shows the results of integrating two meta-heuristic techniques, GRASP and Path-Relinking, which have not been widely used to solve production-scheduling problems despite of their proved efficiency. These techniques were used to solve the problem of minimizing total weighted tardiness problem in a machine, 1 Σ WjTj, and good results in short time were obtained. Experiment outcomes show that the use of Path-Relinking as a final step for GRASP can result in qualitysequence improvements. In order to use GRASP in the solution to this problem, a dynamic utility function for the jobs to process, bearing in mind its descriptive parameters, is proposed. Additionally, this work offers a clear implementation proposal for ventures of different sizes, so they are able to overcome this problem by using MS Excel, instead of specialized scheduling software.
| Translated title of the contribution | Combined use of GRASP and path-relinking during production scheduling in order to minimize total weighted tardiness in a machine |
|---|---|
| Original language | Spanish |
| Pages (from-to) | 79-96 |
| Number of pages | 18 |
| Journal | Ingenieria y Universidad |
| Volume | 14 |
| Issue number | 1 |
| State | Published - 2010 |
Fingerprint
Dive into the research topics of 'Combined use of GRASP and path-relinking during production scheduling in order to minimize total weighted tardiness in a machine'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver