A branch and bound hybrid algorithm with four deterministic heuristics for the resource constrained project scheduling problem (RCPSP)

Research output: Contribution to journalArticlepeer-review

2 Scopus citations

Abstract

This paper addresses the Resource Constrained Project Scheduling Problem (RCPSP). For its solution, a hybrid methodology, which uses a Branch and Bound basic algorithm with dominance rules, is developed and implemented, and is combined with four deterministic heuristics whose objective is to prune the search tree branches, taking into account the iterations available and, at the same time, to minimize the probability of discarding branches that contain optimal solutions. Essentially, these strategies allow the allocation of most iterations to the most promissory regions in an organized manner using only subsets with similar or the same characteristics as those of the optimal solutions at each level of the tree, thus assuring a broad search within the feasible region and, simultaneously, a good exploitation by the selective use of the subsets by level. Finally, the developed algorithm performance is analyzed by solving some of the problems of the PSPLIB test library.

Translated title of the contributionUn algoritmo híbrido de ramificación y acotamiento con cuatro heurísticas determinísticas para el problema de programación de tareas con recursos restringidos (RCPSP)
Original languageEnglish
Pages (from-to)198-207
Number of pages10
JournalDYNA (Colombia)
Volume82
Issue number190
DOIs
StatePublished - 2015
Externally publishedYes

Keywords

  • Deterministic heuristic methods
  • Hybrid algorithm
  • Project scheduling
  • Resource constraints